Job-specific Safe Work Method Statements
Before any high risk construction work starts, JLR prepares a Safe Work Method Statement (SWMS) for that job and site. Each SWMS identifies the hazards, the controls, and who is responsible, and is reviewed with the Principal Contractor before work begins.
- Every worker is consulted on the SWMS and signs on before starting.
- Controls are checked daily through pre-start meetings and site supervision.
- The SWMS is reviewed and workers re-briefed whenever the work or site conditions change, or after any incident.